|
|
|
Looking down at a sediment pool located
on the former Dewey Mongold property.
(6-21-2004) |
Zoomed in image of the concrete
spillway. Dump trucks deposit dirt
being hauled in from a secondary site.
(6-21-2004) |
|
|
|
|
|
|
|
Panoramic view of the Parker Hollow/Needmore
dam project. Baker is to the right
of this photo.
(6-21-2004) |
Zoomed
in image of the emergency spillway being
dug out.
(6-21-2004) |
Wide
angle view of the dam & regular concrete
spillway.
(6-21-2004) |
|
|
|
|
|
|
Image of the regular concrete spillway.
The normal water level will be at the
top of this concrete.
(6-21-2004) |
Construction underway of the emergency
spillway. Dirt is being
transported for use in the dam wall.
(6-21-2004) |
Zoomed in image of the foundation of the
dam wall being constructed.
(6-21-2004) |